Telescope Operations
General
- La Silla Quality Manual
- Document Preparation
- Emergency Procedures
- Documentation Query
- 220 Released Docs Table (since 2002-01-01)
Telescope
- Basic TCS & Autoguider procedures
- Telescope Start-Up
- Telescope Shut-Down
- Zero Pointing the 2p2 Telescope
- Differential Guiding Procedure
- Checking the Telescope Balance
Instruments and Detectors
- WFI Mounting Procedure
- WFI Dismounting Procedure
- FEROS Mounting Procedure
- FEROS Dismounting Procedure
- Grism installation
Tools
- Automatic Report (Autrep)
- WebCams Selection
- Remedy AR | Core Processes
- MPG/ESO 2.2m Env. Monitor | FEROS Env. Monitor
Trouble Shooting
Procedures
- osf2p2 Operation Manual
- Dome FF Control (ps file)
- 220 ESO Pointing Model guideline
- NGAS Disks Exchange Procedure
- NGAS Tools
- SSCIOPS BackUps&Disk Management
- Dewar Refilling
- WFI/FEROS Efficiency Program
- Daily & Weekly Health Checks
- WFI fast photometry
- Fast-photometry with tracker chip
- Work Stations Reboot
- WFI Filter Configuration Log
- Description of the N2 flusing system
- Protective Shutter Adam6060 Remote Control
- WFI VA data back-up on USB Disk
- Pipeline procedures
Check Lists and Forms
- Feros lamp monitoring form
- 2.2m TCS & INS OSF StartUp
- ESO/MPG 220 Daily Activities
- 2.2 Startup Checklist
- Weekly Sciops WS ReBoot
- 220 Opening Checklist
- 220 Night Activities & Closing Down
- LN2 Log-Sheet (ps file)
- DLT Labels
- Service Observing: Night Planning Sheet (.pdf)
- Service Observing: Sky Flat Schedule (.pdf)
- Visiting astro intro checklist (.html)
- Visiting astro arrival handout (.pdf)
Operations Reports Queries
This web page contains information required by the technical staff to OPERATE the ESO/MPI 2.2m Telescope.
For technical information about the ESO220 Telescope please consult the list of currently available documents