Pahoittelumme! Tämä sivu ei ole vielä saatavilla haluamallasi kielellä, joten näytämme sen sijaan alkuperäisversion.
Opening of the ELT secondary blank mould
Opening of the ELT secondary mirror blank mould, containing the still very hot ZERODUR® glass at first annealing. The blank was transferred from the SCHOTT melting facility to the SCHOTT 4-metre blank annealing facility in Mainz, Germany in May 2017. The casting of this mirror is a major step towards building the world’s biggest eye on the sky, one of ESO’s greatest feats.
Oikeudet:SCHOTT/ESO